TAYLOR ELEMENTARY SCHOOL
Address: 9912 S Avenue H (3732E), CHICAGO, IL 60617, Chicago, IL
Latest Inspection: Pass on Aug 26, 2025
Facility Details
- Facility Type: School
- Risk: Risk 1 (High)
- Status: Independent
Inspection History (22 inspections)
- Pass — Tue Aug 26 2025 00:00:00 GMT+0000 (Coordinated Universal Time) () 55. PHYSICAL FACILITIES INSTALLED, MAINTAINED & CLEAN - Comments: WALL AT HANDSINK AREA IN NEED OF SCRAPING PEELING PAINT. INSTRUCTED TO CORRECT AND MAINTAIN.
- Pass — Thu Sep 26 2024 00:00:00 GMT+0000 (Coordinated Universal Time) ()
- Fail — Thu Sep 19 2024 00:00:00 GMT+0000 (Coordinated Universal Time) () 10. ADEQUATE HANDWASHING SINKS PROPERLY SUPPLIED AND ACCESSIBLE - Comments: OBSERVED NO SOAP IN FIRST FLOOR BOYS WASHROOM. INSTRUCTED MANAGER TO PROVIDE SOAO FOR PROPER HAND WASHING. PRIORITY FOUNDATI
- Pass w/ Conditions — Thu Aug 31 2023 00:00:00 GMT+0000 (Coordinated Universal Time) () 5. PROCEDURES FOR RESPONDING TO VOMITING AND DIARRHEAL EVENTS - Comments: OBSERVED NO CLEAN-UP POLICY PROCEDURE FOR VOMITING AND DIARRHEA.MUST PROVIDE AND MAINTAIN.(PRIORITY FOUNDATION 7-38-005) | 10.
- Fail — Tue Aug 29 2023 00:00:00 GMT+0000 (Coordinated Universal Time) () 5. PROCEDURES FOR RESPONDING TO VOMITING AND DIARRHEAL EVENTS - Comments: OBSERVED NO CLEAN-UP POLICY PROCEDURE FOR VOMITING AND DIARRHEA.MUST PROVIDE AND MAINTAIN.(PRIORITY FOUNDATION 7-38-005) | 10.
- Pass — Tue Sep 20 2022 00:00:00 GMT+0000 (Coordinated Universal Time) () 53. TOILET FACILITIES: PROPERLY CONSTRUCTED, SUPPLIED, & CLEANED - Comments: 5-501.17 OBSERVED NO COVERED RECEPTACLE INSIDE OF THE EMPLOYEE'S WOMEN'S TOILET ROOM. INSTRUCTED TO PROVIDE.
- Fail — Thu Sep 15 2022 00:00:00 GMT+0000 (Coordinated Universal Time) () 53. TOILET FACILITIES: PROPERLY CONSTRUCTED, SUPPLIED, & CLEANED - Comments: 5-501.17 OBSERVED NO COVERED RECEPTACLE INSIDE OF THE EMPLOYEE'S WOMEN'S TOILET ROOM. INSTRUCTED TO PROVIDE. | 59. PREVIOUS
- Fail — Thu Sep 08 2022 00:00:00 GMT+0000 (Coordinated Universal Time) () 10. ADEQUATE HANDWASHING SINKS PROPERLY SUPPLIED AND ACCESSIBLE - Comments: 5-202.12(A) OBSERVED INADEQUATE HOT WATER IN THE EMPLOYEE'S WOMEN'S TOILET ROOM, HOT WATER ONLY REACHED 75F AT THE TIME OF T
- Pass — Fri Sep 17 2021 00:00:00 GMT+0000 (Coordinated Universal Time) ()
- Pass — Tue Sep 15 2020 00:00:00 GMT+0000 (Coordinated Universal Time) () 38. INSECTS, RODENTS, & ANIMALS NOT PRESENT - Comments: OBSERVED 1/4" GAP ON BOTTOM LEFT CORNER OF SECOND DOOR TO LEFT AT EXIT #2. INSTRUCTED MANAGER TO SEAL ALL OUTER OPENINGS TO PREVENT PEST ENTRY.
- Pass — Thu Mar 28 2019 00:00:00 GMT+0000 (Coordinated Universal Time) () 55. PHYSICAL FACILITIES INSTALLED, MAINTAINED & CLEAN - Comments: 6-201.11 OBSERVED PEELING PAINT ON THE CEILING IN THE FOOD PREP AREA AND THRU OUT THE 1ST FLOOR HALLWAY. INSTRUCTED TO MAKE SAID SURFA
- Fail — Mon Mar 25 2019 00:00:00 GMT+0000 (Coordinated Universal Time) () 5. PROCEDURES FOR RESPONDING TO VOMITING AND DIARRHEAL EVENTS - Comments: 2-501.11 OBSERVED NO ADEQUATE SANITIZER ON SITE TO PROPERLY CLEAN UP VOMIT OR DIARRHEA EVENTS THAT CAN POTENTIALLY OCCUR INSID
- Pass — Thu Feb 01 2018 00:00:00 GMT+0000 (Coordinated Universal Time) () 35. WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS - Comments: OBSERVED SOME WALLS AND CEILINGS IN THE HALLWAYS ON EACH FLOOR WITH
- Pass — Wed Mar 08 2017 00:00:00 GMT+0000 (Coordinated Universal Time) ()
- Fail — Tue Feb 28 2017 00:00:00 GMT+0000 (Coordinated Universal Time) () 26. ADEQUATE NUMBER, CONVENIENT, ACCESSIBLE, PROPERLY DESIGNED AND INSTALLED - Comments: MUST PROVIDE HOT OR TEMPERED WATER INSIDE THE GIRLS AND BOYS WASHROOM AT THE WASHBOWLS ON THE 1ST FLOOR,INSTRUC
- Pass — Wed Feb 17 2016 00:00:00 GMT+0000 (Coordinated Universal Time) () 33. FOOD AND NON-FOOD CONTACT EQUIPMENT UTENSILS CLEAN, FREE OF ABRASIVE DETERGENTS - Comments: NOTED THE INTERIOR OF THE WALK IN FREEZER DIRTY. MUST CLEAN FAN COVER TO REMOVE DUST. | 35. WALLS, CEILI
- Pass — Thu May 07 2015 00:00:00 GMT+0000 (Coordinated Universal Time) () 34. FLOORS: CONSTRUCTED PER CODE, CLEANED, GOOD REPAIR, COVING INSTALLED, DUST-LESS CLEANING METHODS USED - Comments: CLEAN FLOORS IN ALL JANITORS CLOSETS AND IN THE PREP AREA,ALONG WALL BASE AND CORN
- Pass — Tue May 06 2014 00:00:00 GMT+0000 (Coordinated Universal Time) () 33. FOOD AND NON-FOOD CONTACT EQUIPMENT UTENSILS CLEAN, FREE OF ABRASIVE DETERGENTS - Comments: CLEAN THE FOLLOWING: REFIGERATORS IN ROOM 103 AND IN BREAK ROOM AREA IN BOILER ROOM. | 34. FLOORS: CONST
- Pass — Mon May 06 2013 00:00:00 GMT+0000 (Coordinated Universal Time) () 35. WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS - Comments: PEELING PAINT ON CEILING IN ROOM 102,AND LUNCH ROOM WALLS.MUST REPA
- Fail — Mon Apr 29 2013 00:00:00 GMT+0000 (Coordinated Universal Time) () 2. FACILITIES TO MAINTAIN PROPER TEMPERATURE - Comments: LUNCHROOM REACH IN MILK COOLER IN POOR REPAIR MAINTAINING IMPROPER TEMPERATURE,GASKETS ON DOOR IN POOR REPAIR.AIR TEMPERATURE MAINTAING 44.9F.C
Additional city records (311 complaints, building violations) available via API.
Machine-readable JSON data