SMYSER PRIMARY CENTER
Address: 6200 W PATTERSON AVE, CHICAGO, IL 60634, Chicago, IL
Latest Inspection: Pass on Aug 25, 2025
Facility Details
- Facility Type: School
- Risk: Risk 1 (High)
- Status: Independent
Inspection History (18 inspections)
- Pass — Mon Aug 25 2025 00:00:00 GMT+0000 (Coordinated Universal Time) ()
- Pass — Wed Sep 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) ()
- Pass — Wed Sep 13 2023 00:00:00 GMT+0000 (Coordinated Universal Time) ()
- Fail — Wed Sep 06 2023 00:00:00 GMT+0000 (Coordinated Universal Time) () 10. ADEQUATE HANDWASHING SINKS PROPERLY SUPPLIED AND ACCESSIBLE - Comments: OBSERVED LARGE PRINTING MACHINE BLOCKING HAND WASHING SINK IN KITCHEN ON 1ST FLOOR. HAND WASHING SINK MUST BE ACCESSIBLE FOR
- Pass — Fri Aug 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) () 55. PHYSICAL FACILITIES INSTALLED, MAINTAINED & CLEAN - Comments: USED LIGHT BULBS FOUND NEAR 3 COMPARTMENT SINK. THE PREMISES SHALL BE FREE OF ITEMS THAT ARE UNNECESSARY TO THE OPERATION OR MAINTENAN
- Pass — Fri Sep 10 2021 00:00:00 GMT+0000 (Coordinated Universal Time) () 51. PLUMBING INSTALLED; PROPER BACKFLOW DEVICES - Comments: OBSERVED LOW HOT AND COLD WATER PRESSURE AT HANDWASHING SINKS IN 1ST FLOOR AND 2ND FLOOR BOYS AND GIRLS WASHROOMS.INSTRUCTED TO REPAIR AND M
- Pass — Fri Sep 11 2020 00:00:00 GMT+0000 (Coordinated Universal Time) () 10. ADEQUATE HANDWASHING SINKS PROPERLY SUPPLIED AND ACCESSIBLE - Comments: INSTRUCTED TO PROVIDE HAND WASHING SIGNAGE AT HAND SINK INSIDE (2) EMPLOYEE FIRST FLOOR WASHROOM. | 51. PLUMBING INSTALLED;
- Pass — Fri May 03 2019 00:00:00 GMT+0000 (Coordinated Universal Time) ()
- Pass — Fri Apr 27 2018 00:00:00 GMT+0000 (Coordinated Universal Time) ()
- Pass — Thu May 25 2017 00:00:00 GMT+0000 (Coordinated Universal Time) ()
- Fail — Thu May 18 2017 00:00:00 GMT+0000 (Coordinated Universal Time) () 18. NO EVIDENCE OF RODENT OR INSECT OUTER OPENINGS PROTECTED/RODENT PROOFED, A WRITTEN LOG SHALL BE MAINTAINED AVAILABLE TO THE INSPECTORS - Comments: FOUND NO PEST CONTROL LOG/SERVICE FROM ILLINOIS L
- Pass — Mon Mar 21 2016 00:00:00 GMT+0000 (Coordinated Universal Time) () 38. VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED - Comments: LOW WATER PRESSURE AT BOYS AND GIRLS BATHROOM HAND SINKS BASEMENT AND FIRST FLOOR AREAS, INSTRUC
- Pass — Thu Jan 29 2015 00:00:00 GMT+0000 (Coordinated Universal Time) () 33. FOOD AND NON-FOOD CONTACT EQUIPMENT UTENSILS CLEAN, FREE OF ABRASIVE DETERGENTS - Comments: INSTRUCTED TO DETAIL CLEAN AND MAINTAIN INTERIOR SURFACES OFMICROWAVE OVEN WITH DRIED FOOD DEBRIS IN 2ND
- Pass — Mon Feb 24 2014 00:00:00 GMT+0000 (Coordinated Universal Time) () 32. FOOD AND NON-FOOD CONTACT SURFACES PROPERLY DESIGNED, CONSTRUCTED AND MAINTAINED - Comments: RAW WOODEN SHELVINGS INSIDE THE FAN ROOM/OFFICE NEAR THE LUNCHROOM MUST BE SEALED USING A NON-TOXIC FIN
- Pass — Mon Mar 11 2013 00:00:00 GMT+0000 (Coordinated Universal Time) () 35. WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS - Comments: Damaged/stained ceiling tiles in 2nd floor classrooms shall be repa
- Pass — Wed May 23 2012 00:00:00 GMT+0000 (Coordinated Universal Time) () 35. WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS - Comments: PEELING PAINT ON CEILING IN BOY'S WASHROOM BASEMENT MUST BE REMOVED
- Pass — Fri Sep 09 2011 00:00:00 GMT+0000 (Coordinated Universal Time) ()
- Fail — Fri Sep 02 2011 00:00:00 GMT+0000 (Coordinated Universal Time) () 24. DISH WASHING FACILITIES: PROPERLY DESIGNED, CONSTRUCTED, MAINTAINED, INSTALLED, LOCATED AND OPERATED - Comments: All dish washing machines must be of a type that complies with all requirements of
Additional city records (311 complaints, building violations) available via API.
Machine-readable JSON data