RUSH DAY SCHOOL
Address: 2150 W HARRISON ST, CHICAGO, IL 60612, Chicago, IL
Latest Inspection: Pass on May 15, 2025
Facility Details
- Facility Type: School
- Risk: Risk 3 (Low)
- Status: Independent
Inspection History (14 inspections)
- Pass — Thu May 15 2025 00:00:00 GMT+0000 (Coordinated Universal Time) ()
- Pass w/ Conditions — Wed May 08 2024 00:00:00 GMT+0000 (Coordinated Universal Time) () 54. GARBAGE & REFUSE PROPERLY DISPOSED; FACILITIES MAINTAINED - Comments: OBSERVED OUTSIDE GARBAGE DUMPSTERS OVERFLOWING WITH TRASH, BOXES, AND LIDS WIDE OPEN WITH TRASH ABOVE RIM. INSTRUCTED TO HAVE
- Pass — Mon Dec 11 2023 00:00:00 GMT+0000 (Coordinated Universal Time) ()
- Pass — Tue Dec 20 2022 00:00:00 GMT+0000 (Coordinated Universal Time) ()
- Fail — Thu Dec 15 2022 00:00:00 GMT+0000 (Coordinated Universal Time) () 10. ADEQUATE HANDWASHING SINKS PROPERLY SUPPLIED AND ACCESSIBLE - Comments: 5-202.12 (A)--OBSERVED IMPROPER WATER TEMPERATURE AT HAND SINK AT 90.3F IN STAFF BATHROOM. WATER TEMPERATURE AT HAND SINK MU
- Fail — Mon Dec 12 2022 00:00:00 GMT+0000 (Coordinated Universal Time) () 10. ADEQUATE HANDWASHING SINKS PROPERLY SUPPLIED AND ACCESSIBLE - Comments: OBSERVED IMPROPER WATER TEMPERATURE AT HAND SINK AT 90.3F IN STAFF BATHROOM. ALSO OBSERVED IMPROPER WATER TEMPERATURE AT HAN
- Pass w/ Conditions — Thu May 06 2021 00:00:00 GMT+0000 (Coordinated Universal Time) () 3. MANAGEMENT, FOOD EMPLOYEE AND CONDITIONAL EMPLOYEE; KNOWLEDGE, RESPONSIBILITIES AND REPORTING - Comments: OBSERVED NO SIGNED EMPLOYEES HEALTH POLICIES.MUST PROVIDE AND MAINTAIN.(PRIORITY FOUNDATION
- Pass — Thu Nov 07 2019 00:00:00 GMT+0000 (Coordinated Universal Time) ()
- Pass — Fri Nov 30 2018 00:00:00 GMT+0000 (Coordinated Universal Time) ()
- Pass — Fri Dec 08 2017 00:00:00 GMT+0000 (Coordinated Universal Time) ()
- Pass — Thu Oct 20 2016 00:00:00 GMT+0000 (Coordinated Universal Time) () 35. WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS - Comments: NSTRUCTED TO REMOVE THE SPIDER WEB FROM THE TOILET ROOM IN CLASSROO
- Pass — Fri Sep 25 2015 00:00:00 GMT+0000 (Coordinated Universal Time) () 38. VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED - Comments: ADJUST MIXING VALVE ON HAND SINKS.
- Pass — Fri Oct 17 2014 00:00:00 GMT+0000 (Coordinated Universal Time) () 38. VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED - Comments: NOTED THE BASE OF THE HOT WATER KNOB AT THE EXPOSED HAND SINK IN THE LUNCH ROOM HAS LEAK. MUST R
- Pass — Fri Nov 08 2013 00:00:00 GMT+0000 (Coordinated Universal Time) () 34. FLOORS: CONSTRUCTED PER CODE, CLEANED, GOOD REPAIR, COVING INSTALLED, DUST-LESS CLEANING METHODS USED - Comments: FLOOR NEED GENERAL CLEANING IN THE STORAGE CLOSET WHERE REFRIGERATORS ARE STORED A
Additional city records (311 complaints, building violations) available via API.
Machine-readable JSON data